About Sunchaser

Engineering trust in solar mounting structures since 2013

Sunchaser manufacturing facility

About Sunchaser

Integrated Manufacturer & One-Stop Supplier of Horizontal Single-Axis Trackers and Seasonal tilt MMS structures for Ground mount PV plants.

Our concept is to help EPCs to economize the project by optimization of Structure weight, Quick installations, Higher Power generation due to unique design parameters, Optimized site layout, Selection of foundation type, guidance for foundation depths and Most importantly by supplying years of maintenance & corrosion free life.

Backed by the Patel Technomation legacy since 1991, we control every stage in-house — design, galvanising, roll-forming and self-manufactured controllers — so quality and delivery stay in our hands.

3+ GWInstalled Capacity
6,50,000Sq. Ft. Facility
1250+Team Strength
210+Machines

What Drives Us

Built on engineering, proven by trust

🏭

Own Factories

Two state-of-the-art plants in Gujarat (Hadamtala) and Maharashtra (Butibori) with end-to-end manufacturing.

🌍

International Reach

Sunchaser GmbH in Oberschleißheim, Germany serving European EPCs and developers.

ISO 9001:2015

Certified quality management across manufacturing and customer service.

🔧

In-House Controllers

Closed-loop, self-manufactured controllers for precise backtracking and sun-following.

3+ GW Installed

Across 650+ projects with 3+ GW currently in the pipeline.

🛡

15-Year Warranty

Structural, corrosion and drive-parts warranties backed by 25-year spare supply.

Our Journey

Milestones

2020

Research & Development

Product design, engineering simulations and prototyping.

2021

First Pilot Installations

Proof of concept and field validation in real-world conditions.

2022

Production Begins

15 MWp installed — the start of structured production and scale-up.

2023

Expansion Phase

Reached 135 MWp of installed capacity.

2024

Rapid Scaling

460 MWp installed across multiple regions.

2025

Accelerated Growth

650 MWp with successful commissioning and rapid deployment.

2026

1 GW+ Milestone

1,023 MWp installed — achieving 1 GW+ of commissioned capacity.

Ready to start your project?

Tell us about your site and we'll engineer a tracker or MMS solution tailored to your terrain, climate and yield targets.

Start a Project →