2.4MW BHADER SAVERGY POWER SOLUTION
Home / Our Projects / 2.4MW BHADER SAVERGY POWER SOLUTION
2.4MW Upleta Solar Project Powered by 1P Seasonal Tilt
The 2.4MW solar project is part of Sunchaser Structures' utility-scale solar portfolio at Upleta, Gujarat. It was executed for Savergy Power Solution. The plant was commissioned in Jan 2025.
The plant is built on the 1P Seasonal Tilt system, engineered to hold module alignment accurately over the full project life and to keep generation consistent season after season.
Sunchaser's engineering, galvanised structural design and site execution keep the plant dependable through its operating life and reduce long-term maintenance effort.
