✔ Completed

4.3MW PRAGPAR, KUTCHH (PARCOS - 1) DEON ENERGY (MUMBAI)

Home / Our Projects / 4.3MW PRAGPAR, KUTCHH (PARCOS - 1) DEON ENERGY (MUMBAI)

Capacity4.3MW
Structure type1P Seasonal Tilt(Hat)
CommissionedSep 2025
ClientDeon Energy (Mumbai)
LocationRapar
4.3MW1P Seasonal Tilt(Hat)SUNCHASER X
Project overview

4.3MW Rapar Solar Project Powered by 1P Seasonal Tilt(Hat)

The 4.3MW solar project adds to Sunchaser Structures' installed base of solar mounting and tracking systems at Rapar, Gujarat. It was executed for Deon Energy (Mumbai). The plant was commissioned in Sep 2025.

The 1P Seasonal Tilt(Hat) platform underpins the installation, chosen for its structural stability, low maintenance demand and dependable day-to-day performance.

The project reflects Sunchaser's focus on precision engineering, durable structures and disciplined site execution for utility-scale solar.

Where it is

Site location — Rapar

View on map ↗

Ready to start your project?

Partner with Sunchaser for precision-engineered solar trackers and mounting systems that enable faster installations, maximize energy generation, and deliver long-term reliability for utility-scale solar projects. Let's build your next solar project with confidence.

Start a Project →