✔ Completed

0.7MW NIZHAR-1(HANUMAN OVS) KP GROUP

Home / Our Projects / 0.7MW NIZHAR-1(HANUMAN OVS) KP GROUP

Capacity0.7MW
Structure type1P HSAT
CommissionedSep 2024
ClientKp Group
LocationTaloda
0.7MW1P HSATSUNCHASER X
Project overview

0.7MW Taloda Solar Project Powered by 1P HSAT

The 0.7MW solar project is part of Sunchaser Structures' utility-scale solar portfolio at Taloda, Maharashtra. It was executed for Kp Group. The plant was commissioned in Sep 2024.

The plant is built on the 1P HSAT system, engineered to hold module alignment accurately over the full project life and to keep generation consistent season after season.

Sunchaser's engineering, galvanised structural design and site execution keep the plant dependable through its operating life and reduce long-term maintenance effort.

Where it is

Site location — Taloda

View on map ↗

Ready to start your project?

Partner with Sunchaser for precision-engineered solar trackers and mounting systems that enable faster installations, maximize energy generation, and deliver long-term reliability for utility-scale solar projects. Let's build your next solar project with confidence.

Start a Project →