✔ Terminé

0.7MW NIZHAR-1(HANUMAN OVS) KP GROUP

Accueil / Projets / 0.7MW NIZHAR-1(HANUMAN OVS) KP GROUP

Puissance0.7MW
Type de tracker1P HSAT
Mise en serviceSep 2024
ClientKp Group
LocalisationTaloda
0.7MW1P HSATSUNCHASER X
Aperçu du projet

0.7MW Taloda Solar Project Powered by 1P HSAT

The 0.7MW solar project is part of Sunchaser Structures' utility-scale solar portfolio at Taloda, Maharashtra. It was executed for Kp Group. The plant was commissioned in Sep 2024.

The plant is built on the 1P HSAT system, engineered to hold module alignment accurately over the full project life and to keep generation consistent season after season.

Sunchaser's engineering, galvanised structural design and site execution keep the plant dependable through its operating life and reduce long-term maintenance effort.

Localisation

Emplacement du site — Taloda

Voir sur la carte ↗

Prêt à lancer votre projet ?

Parlez-nous de votre site et nous concevrons une solution tracker ou MMS adaptée à votre terrain, climat et objectifs de rendement.

Démarrer un projet →