✔ Completato

1.02MW RAMGADH(SKILL) DEON ENERGY

Home / Progetti / 1.02MW RAMGADH(SKILL) DEON ENERGY

Potenza1.02MW
Tipo di inseguitore1P HSAT
Messa in servizioApr 2024
ClienteDeon Energy
LocalitàDhrangadhra
1.02MW1P HSATSUNCHASER X
Panoramica del progetto

1.02MW Dhrangadhra Solar Project Powered by 1P HSAT

The 1.02MW solar project is part of Sunchaser Structures' utility-scale solar portfolio at Dhrangadhra, Gujarat. It was executed for Deon Energy. The plant was commissioned in Apr 2024.

The plant is built on the 1P HSAT system, engineered to hold module alignment accurately over the full project life and to keep generation consistent season after season.

Sunchaser's engineering, galvanised structural design and site execution keep the plant dependable through its operating life and reduce long-term maintenance effort.

Dove si trova

Posizione del sito — Dhrangadhra

Vedi sulla mappa ↗

Pronto ad avviare il tuo progetto?

Raccontaci del tuo sito e progetteremo una soluzione tracker o MMS su misura per terreno, clima e obiettivi di rendimento.

Avvia un progetto →