1.13MW KODRAM-P1(MEHSANA) SUNDROP POWER
Home / Our Projects / 1.13MW KODRAM-P1(MEHSANA) SUNDROP POWER
1.13MW Kheralu Solar Project Powered by 1P Seasonal Tilt
Sunchaser Structures supplied and commissioned the 1.13MW solar project at Kheralu, Gujarat. It was executed for Sundrop Power. The plant was commissioned in Jan 2025.
It uses the 1P Seasonal Tilt structure, designed for precise module alignment, predictable long-term behaviour and straightforward installation on site.
Careful structural engineering and quality-controlled fabrication give the plant a long, low-maintenance service life while supporting steady energy delivery.
