✔ Terminé

1.13MW KODRAM-P1(MEHSANA) SUNDROP POWER

Accueil / Projets / 1.13MW KODRAM-P1(MEHSANA) SUNDROP POWER

Puissance1.13MW
Type de tracker1P Seasonal Tilt
Mise en serviceJan 2025
ClientSundrop Power
LocalisationKheralu
1.13MW1P Seasonal TiltSUNCHASER X
Aperçu du projet

1.13MW Kheralu Solar Project Powered by 1P Seasonal Tilt

Sunchaser Structures supplied and commissioned the 1.13MW solar project at Kheralu, Gujarat. It was executed for Sundrop Power. The plant was commissioned in Jan 2025.

It uses the 1P Seasonal Tilt structure, designed for precise module alignment, predictable long-term behaviour and straightforward installation on site.

Careful structural engineering and quality-controlled fabrication give the plant a long, low-maintenance service life while supporting steady energy delivery.

Localisation

Emplacement du site — Kheralu

Voir sur la carte ↗

Prêt à lancer votre projet ?

Parlez-nous de votre site et nous concevrons une solution tracker ou MMS adaptée à votre terrain, climat et objectifs de rendement.

Démarrer un projet →