1.151MW BHECHDA DEON ENERGY
Puissance1.151MW
Type de tracker1P Seasonal Tilt
Mise en serviceJan 2026
ClientDeon Energy
LocalisationDhrangadhra
1.151MW1P Seasonal TiltSUNCHASER X
Aperçu du projet
1.151MW Dhrangadhra Solar Project Powered by 1P Seasonal Tilt
Sunchaser Structures supplied and commissioned the 1.151MW solar project at Dhrangadhra, Gujarat. It was executed for Deon Energy. The plant was commissioned in Jan 2026.
It uses the 1P Seasonal Tilt structure, designed for precise module alignment, predictable long-term behaviour and straightforward installation on site.
Careful structural engineering and quality-controlled fabrication give the plant a long, low-maintenance service life while supporting steady energy delivery.
