✔ Terminé

1.705MW MAKDALA(MBR) PROZEAL GREEN ENERGY LIMITED

Accueil / Projets / 1.705MW MAKDALA(MBR) PROZEAL GREEN ENERGY LIMITED

Puissance1.705MW
Type de tracker1P HSAT(All DC)
Mise en serviceOct 2024
ClientProzeal Green Energy Limited
LocalisationTharad
1.705MW1P HSAT(All DC)SUNCHASER X
Aperçu du projet

1.705MW Tharad Solar Project Powered by 1P HSAT(All DC)

The 1.705MW solar project adds to Sunchaser Structures' installed base of solar mounting and tracking systems at Tharad, Gujarat. It was executed for Prozeal Green Energy Limited. The plant was commissioned in Oct 2024.

The 1P HSAT(All DC) platform underpins the installation, chosen for its structural stability, low maintenance demand and dependable day-to-day performance.

The project reflects Sunchaser's focus on precision engineering, durable structures and disciplined site execution for utility-scale solar.

Localisation

Emplacement du site — Tharad

Voir sur la carte ↗

Prêt à lancer votre projet ?

Parlez-nous de votre site et nous concevrons une solution tracker ou MMS adaptée à votre terrain, climat et objectifs de rendement.

Démarrer un projet →