10MW DHAMDOD(ANKLESHWAR) KRV SOLAR
Leistung10MW
Tracker-Typ1P HSAT (All DC)
InbetriebnahmeApr 2025
KundeKrv Solar
StandortKosamba
10MW1P HSAT (All DC)SUNCHASER X
Projektübersicht
10MW Kosamba Solar Project Powered by 1P HSAT (All DC)
Sunchaser Structures supplied and commissioned the 10MW solar project at Kosamba, Gujarat. It was executed for Krv Solar. The plant was commissioned in Apr 2025.
It uses the 1P HSAT (All DC) structure, designed for precise module alignment, predictable long-term behaviour and straightforward installation on site.
Careful structural engineering and quality-controlled fabrication give the plant a long, low-maintenance service life while supporting steady energy delivery.
