✔ Abgeschlossen

16.006MW SHIRKAZHI(PHASE-2) RIGHT CHOICE FOUNDATION

Start / Projekte / 16.006MW SHIRKAZHI(PHASE-2) RIGHT CHOICE FOUNDATION

Leistung16.006MW
Tracker-TypAIRAVAT - 1P HSAT MULTI DRIVE
InbetriebnahmeJun 2026
KundeRight Choice Foundation
StandortMayiladuthurai
16.006MWAIRAVAT - 1P HSAT MULTI DRIVESUNCHASER X
Projektübersicht

16.006MW Mayiladuthurai Solar Project Powered by 1P HSAT Airavat (All DC)

The 16.006MW solar project is part of Sunchaser Structures' utility-scale solar portfolio at Mayiladuthurai, Tamil Nadu. It was executed for Right Choice Foundation. The plant was commissioned in Jun 2026.

The plant is built on the 1P HSAT Airavat (All DC) system, engineered to hold module alignment accurately over the full project life and to keep generation consistent season after season.

Sunchaser's engineering, galvanised structural design and site execution keep the plant dependable through its operating life and reduce long-term maintenance effort.

Standort

Projektstandort — Mayiladuthurai

Auf Karte ansehen ↗

Bereit, Ihr Projekt zu starten?

Erzählen Sie uns von Ihrem Standort und wir entwickeln eine Tracker- oder MMS-Lösung, die auf Gelände, Klima und Ertragsziele zugeschnitten ist.

Projekt starten →