✔ Abgeschlossen

2.009MW HADAMATIYA RENEURJA ENERGY

Start / Projekte / 2.009MW HADAMATIYA RENEURJA ENERGY

Leistung2.009MW
Tracker-Typ1P Seasonal Tilt
InbetriebnahmeDec 2025
KundeReneurja Energy
StandortPaddhari
2.009MW1P Seasonal TiltSUNCHASER X
Projektübersicht

2.009MW Paddhari Solar Project Powered by 1P Seasonal Tilt

The 2.009MW solar project is part of Sunchaser Structures' utility-scale solar portfolio at Paddhari, Gujarat. It was executed for Reneurja Energy. The plant was commissioned in Dec 2025.

The plant is built on the 1P Seasonal Tilt system, engineered to hold module alignment accurately over the full project life and to keep generation consistent season after season.

Sunchaser's engineering, galvanised structural design and site execution keep the plant dependable through its operating life and reduce long-term maintenance effort.

Standort

Projektstandort — Paddhari

Auf Karte ansehen ↗

Bereit, Ihr Projekt zu starten?

Erzählen Sie uns von Ihrem Standort und wir entwickeln eine Tracker- oder MMS-Lösung, die auf Gelände, Klima und Ertragsziele zugeschnitten ist.

Projekt starten →