✔ Terminé

2.148MW UMALL PHASE-2 RAYZON GREEN PVT. LTD.

Accueil / Projets / 2.148MW UMALL PHASE-2 RAYZON GREEN PVT. LTD.

Puissance2.148MW
Type de tracker1P Seasonal Tilt
Mise en serviceFeb 2026
ClientRayzon Green Pvt. Ltd.
LocalisationSinor
2.148MW1P Seasonal TiltSUNCHASER X
Aperçu du projet

2.148MW Sinor Solar Project Powered by 1P Seasonal Tilt

The 2.148MW solar project is part of Sunchaser Structures' utility-scale solar portfolio at Sinor, Gujarat. It was executed for Rayzon Green Pvt. Ltd.. The plant was commissioned in Feb 2026.

The plant is built on the 1P Seasonal Tilt system, engineered to hold module alignment accurately over the full project life and to keep generation consistent season after season.

Sunchaser's engineering, galvanised structural design and site execution keep the plant dependable through its operating life and reduce long-term maintenance effort.

Localisation

Emplacement du site — Sinor

Voir sur la carte ↗

Prêt à lancer votre projet ?

Parlez-nous de votre site et nous concevrons une solution tracker ou MMS adaptée à votre terrain, climat et objectifs de rendement.

Démarrer un projet →