✔ Completato

2.1MW INGORALA(AMRELI) DEON ENERGY

Home / Progetti / 2.1MW INGORALA(AMRELI) DEON ENERGY

Potenza2.1MW
Tipo di inseguitoreAIRAVAT - 1P HSAT MULTI DRIVE
Messa in servizioAug 2024
ClienteDeon Energy
LocalitàDamnagar
2.1MWAIRAVAT - 1P HSAT MULTI DRIVESUNCHASER X
Panoramica del progetto

2.1MW Damnagar Solar Project Powered by 1P HSAT(All DC)

Sunchaser Structures supplied and commissioned the 2.1MW solar project at Damnagar, Gujarat. It was executed for Deon Energy. The plant was commissioned in Aug 2024.

It uses the 1P HSAT(All DC) structure, designed for precise module alignment, predictable long-term behaviour and straightforward installation on site.

Careful structural engineering and quality-controlled fabrication give the plant a long, low-maintenance service life while supporting steady energy delivery.

Dove si trova

Posizione del sito — Damnagar

Vedi sulla mappa ↗

Pronto ad avviare il tuo progetto?

Raccontaci del tuo sito e progetteremo una soluzione tracker o MMS su misura per terreno, clima e obiettivi di rendimento.

Avvia un progetto →