✔ Abgeschlossen

2.41MW VALOD-1(TAPI) RAYZON GREEN PVT. LTD.

Start / Projekte / 2.41MW VALOD-1(TAPI) RAYZON GREEN PVT. LTD.

Leistung2.41MW
Tracker-Typ1P HSAT(All DC)
InbetriebnahmeJan 2025
KundeRayzon Green Pvt. Ltd.
StandortVyara
2.41MW1P HSAT(All DC)SUNCHASER X
Projektübersicht

2.41MW Vyara Solar Project Powered by 1P HSAT(All DC)

The 2.41MW solar project is part of Sunchaser Structures' utility-scale solar portfolio at Vyara, Gujarat. It was executed for Rayzon Green Pvt. Ltd.. The plant was commissioned in Jan 2025.

The plant is built on the 1P HSAT(All DC) system, engineered to hold module alignment accurately over the full project life and to keep generation consistent season after season.

Sunchaser's engineering, galvanised structural design and site execution keep the plant dependable through its operating life and reduce long-term maintenance effort.

Standort

Projektstandort — Vyara

Auf Karte ansehen ↗

Bereit, Ihr Projekt zu starten?

Erzählen Sie uns von Ihrem Standort und wir entwickeln eine Tracker- oder MMS-Lösung, die auf Gelände, Klima und Ertragsziele zugeschnitten ist.

Projekt starten →