✔ Completato

3.086MW SARDARGADH - MMG DEON ENERGY

Home / Progetti / 3.086MW SARDARGADH - MMG DEON ENERGY

Potenza3.086MW
Tipo di inseguitore1P Seasonal Tilt
Messa in servizioFeb 2026
ClienteDeon Energy
LocalitàManavadar
3.086MW1P Seasonal TiltSUNCHASER X
Panoramica del progetto

3.086MW Manavadar Solar Project Powered by 1P Seasonal Tilt

Sunchaser Structures supplied and commissioned the 3.086MW solar project at Manavadar, Gujarat. It was executed for Deon Energy. The plant was commissioned in Feb 2026.

It uses the 1P Seasonal Tilt structure, designed for precise module alignment, predictable long-term behaviour and straightforward installation on site.

Careful structural engineering and quality-controlled fabrication give the plant a long, low-maintenance service life while supporting steady energy delivery.

Dove si trova

Posizione del sito — Manavadar

Vedi sulla mappa ↗

Pronto ad avviare il tuo progetto?

Raccontaci del tuo sito e progetteremo una soluzione tracker o MMS su misura per terreno, clima e obiettivi di rendimento.

Avvia un progetto →