✔ Terminé

3.25MW SADODAR JJPV SOLAR PVT. LTD.

Accueil / Projets / 3.25MW SADODAR JJPV SOLAR PVT. LTD.

Puissance3.25MW
Type de tracker1P Seasonal tilt
Mise en serviceMay 2024
ClientJJPV SOLAR PVT. LTD.
LocalisationBhayavadar
3.25MW1P Seasonal tiltSUNCHASER X
Aperçu du projet

3.25MW Bhayavadar Solar Project Powered by 1P Seasonal tilt

The 3.25MW solar project is part of Sunchaser Structures' utility-scale solar portfolio at Bhayavadar, Gujarat. It was executed for JJPV SOLAR PVT. LTD.. The plant was commissioned in May 2024.

The plant is built on the 1P Seasonal tilt system, engineered to hold module alignment accurately over the full project life and to keep generation consistent season after season.

Sunchaser's engineering, galvanised structural design and site execution keep the plant dependable through its operating life and reduce long-term maintenance effort.

Localisation

Emplacement du site — Bhayavadar

Voir sur la carte ↗

Prêt à lancer votre projet ?

Parlez-nous de votre site et nous concevrons une solution tracker ou MMS adaptée à votre terrain, climat et objectifs de rendement.

Démarrer un projet →