✔ Terminé

3.4MW PIYAVA JJPV SOLAR PVT. LTD.

Accueil / Projets / 3.4MW PIYAVA JJPV SOLAR PVT. LTD.

Puissance3.4MW
Type de tracker1P Seasonal Tilt
Mise en serviceMay 2025
ClientJJPV SOLAR PVT. LTD.
LocalisationAmreli
3.4MW1P Seasonal TiltSUNCHASER X
Aperçu du projet

3.4MW Amreli Solar Project Powered by 1P Seasonal Tilt

The 3.4MW solar project is part of Sunchaser Structures' utility-scale solar portfolio at Amreli, Gujarat. It was executed for JJPV SOLAR PVT. LTD.. The plant was commissioned in May 2025.

The plant is built on the 1P Seasonal Tilt system, engineered to hold module alignment accurately over the full project life and to keep generation consistent season after season.

Sunchaser's engineering, galvanised structural design and site execution keep the plant dependable through its operating life and reduce long-term maintenance effort.

Localisation

Emplacement du site — Amreli

Voir sur la carte ↗

Prêt à lancer votre projet ?

Parlez-nous de votre site et nous concevrons une solution tracker ou MMS adaptée à votre terrain, climat et objectifs de rendement.

Démarrer un projet →