3.799MW DHANDHUKA COSMOS GREEN POWER
Leistung3.799MW
Tracker-Typ1P Seasonal Tilt
InbetriebnahmeDec 2025
KundeCosmos Green Power
StandortDhandhuka
3.799MW1P Seasonal TiltSUNCHASER X
Projektübersicht
3.799MW Dhandhuka Solar Project Powered by 1P Seasonal Tilt
Sunchaser Structures supplied and commissioned the 3.799MW solar project at Dhandhuka, Gujarat. It was executed for Cosmos Green Power. The plant was commissioned in Dec 2025.
It uses the 1P Seasonal Tilt structure, designed for precise module alignment, predictable long-term behaviour and straightforward installation on site.
Careful structural engineering and quality-controlled fabrication give the plant a long, low-maintenance service life while supporting steady energy delivery.
