✔ Terminé

3.892MW GALA_DHRANADHARA RENEURJA ENERGY

Accueil / Projets / 3.892MW GALA_DHRANADHARA RENEURJA ENERGY

Puissance3.892MW
Type de tracker2P FIXED TILT
Mise en serviceMay 2026
ClientReneurja Energy
LocalisationKachchh
3.892MW2P FIXED TILTSUNCHASER X
Aperçu du projet

3.892MW Kachchh Solar Project Powered by 2P Fixed Tilt

Sunchaser Structures supplied and commissioned the 3.892MW solar project at Kachchh, Gujarat. It was executed for Reneurja Energy. The plant was commissioned in May 2026.

It uses the 2P Fixed Tilt structure, designed for precise module alignment, predictable long-term behaviour and straightforward installation on site.

Careful structural engineering and quality-controlled fabrication give the plant a long, low-maintenance service life while supporting steady energy delivery.

Localisation

Emplacement du site — Kachchh

Voir sur la carte ↗

Prêt à lancer votre projet ?

Parlez-nous de votre site et nous concevrons une solution tracker ou MMS adaptée à votre terrain, climat et objectifs de rendement.

Démarrer un projet →