3.912MW VINDHYACHAL DEON ENERGY
Home / Our Projects / 3.912MW VINDHYACHAL DEON ENERGY
3.912MW Singrauli Solar Project Powered by 2P Fixed Tilt
Sunchaser Structures supplied and commissioned the 3.912MW solar project at Singrauli, Madhya Pradesh. It was executed for Deon Energy. The plant was commissioned in Feb 2026.
It uses the 2P Fixed Tilt structure, designed for precise module alignment, predictable long-term behaviour and straightforward installation on site.
Careful structural engineering and quality-controlled fabrication give the plant a long, low-maintenance service life while supporting steady energy delivery.
