✔ Completato

3.912MW VINDHYACHAL DEON ENERGY

Home / Progetti / 3.912MW VINDHYACHAL DEON ENERGY

Potenza3.912MW
Tipo di inseguitore2P Fixed Tilt
Messa in servizioFeb 2026
ClienteDeon Energy
LocalitàSingrauli
3.912MW2P Fixed TiltSUNCHASER X
Panoramica del progetto

3.912MW Singrauli Solar Project Powered by 2P Fixed Tilt

Sunchaser Structures supplied and commissioned the 3.912MW solar project at Singrauli, Madhya Pradesh. It was executed for Deon Energy. The plant was commissioned in Feb 2026.

It uses the 2P Fixed Tilt structure, designed for precise module alignment, predictable long-term behaviour and straightforward installation on site.

Careful structural engineering and quality-controlled fabrication give the plant a long, low-maintenance service life while supporting steady energy delivery.

Dove si trova

Posizione del sito — Singrauli

Vedi sulla mappa ↗

Pronto ad avviare il tuo progetto?

Raccontaci del tuo sito e progetteremo una soluzione tracker o MMS su misura per terreno, clima e obiettivi di rendimento.

Avvia un progetto →