✔ Completato

4.005MW VALOD PHASE-2 RAYZON GREEN PVT. LTD.

Home / Progetti / 4.005MW VALOD PHASE-2 RAYZON GREEN PVT. LTD.

Potenza4.005MW
Tipo di inseguitore1P Seasonal Tilt
Messa in servizioDec 2025
ClienteRayzon Green Pvt. Ltd.
LocalitàVyara
4.005MW1P Seasonal TiltSUNCHASER X
Panoramica del progetto

4.005MW Vyara Solar Project Powered by 1P Seasonal Tilt

The 4.005MW solar project is part of Sunchaser Structures' utility-scale solar portfolio at Vyara, Gujarat. It was executed for Rayzon Green Pvt. Ltd.. The plant was commissioned in Dec 2025.

The plant is built on the 1P Seasonal Tilt system, engineered to hold module alignment accurately over the full project life and to keep generation consistent season after season.

Sunchaser's engineering, galvanised structural design and site execution keep the plant dependable through its operating life and reduce long-term maintenance effort.

Dove si trova

Posizione del sito — Vyara

Vedi sulla mappa ↗

Pronto ad avviare il tuo progetto?

Raccontaci del tuo sito e progetteremo una soluzione tracker o MMS su misura per terreno, clima e obiettivi di rendimento.

Avvia un progetto →