✔ Terminé

4.025MW DHOLKIA-2 (SHEKHPIPALIYA) RAYCAL POWER INFRA PVT. LTD.

Accueil / Projets / 4.025MW DHOLKIA-2 (SHEKHPIPALIYA) RAYCAL POWER INFRA PVT. LTD.

Puissance4.025MW
Type de tracker2P Seasonal Tilt
Mise en serviceMar 2026
ClientRaycal Power Infra Pvt. Ltd.
LocalisationLathi
4.025MW2P Seasonal TiltSUNCHASER X
Aperçu du projet

4.025MW Lathi Solar Project Powered by 2P Seasonal Tilt

Sunchaser Structures supplied and commissioned the 4.025MW solar project at Lathi, Gujarat. It was executed for Raycal Power Infra Pvt. Ltd.. The plant was commissioned in Mar 2026.

It uses the 2P Seasonal Tilt structure, designed for precise module alignment, predictable long-term behaviour and straightforward installation on site.

Careful structural engineering and quality-controlled fabrication give the plant a long, low-maintenance service life while supporting steady energy delivery.

Localisation

Emplacement du site — Lathi

Voir sur la carte ↗

Prêt à lancer votre projet ?

Parlez-nous de votre site et nous concevrons une solution tracker ou MMS adaptée à votre terrain, climat et objectifs de rendement.

Démarrer un projet →