4.034MW NALDHARI-2(SURENDRANAGAR) DEON ENERGY
الرئيسية / المشاريع / 4.034MW NALDHARI-2(SURENDRANAGAR) DEON ENERGY
القدرة4.034MW
نوع المتتبّع1P HSAT
سنة التشغيلJul 2025
العميلDeon Energy
الموقعThan
4.034MW1P HSATSUNCHASER X
نظرة عامة على المشروع
4.034MW Than Solar Project Powered by 1P HSAT
Sunchaser Structures supplied and commissioned the 4.034MW solar project at Than, Gujarat. It was executed for Deon Energy. The plant was commissioned in Jul 2025.
It uses the 1P HSAT structure, designed for precise module alignment, predictable long-term behaviour and straightforward installation on site.
Careful structural engineering and quality-controlled fabrication give the plant a long, low-maintenance service life while supporting steady energy delivery.
