4.2MW BHERSAM-8(VARUDI) KP GROUP
القدرة4.2MW
نوع المتتبّعAIRAVAT - 1P HSAT MULTI DRIVE
سنة التشغيلSep 2024
العميلKp Group
الموقعBharuch
4.2MWAIRAVAT - 1P HSAT MULTI DRIVESUNCHASER X
نظرة عامة على المشروع
4.2MW Bharuch Solar Project Powered by 1P HSAT
Sunchaser Structures supplied and commissioned the 4.2MW solar project at Bharuch, Gujarat. It was executed for Kp Group. The plant was commissioned in Sep 2024.
It uses the 1P HSAT structure, designed for precise module alignment, predictable long-term behaviour and straightforward installation on site.
Careful structural engineering and quality-controlled fabrication give the plant a long, low-maintenance service life while supporting steady energy delivery.
