4.418MW UGAMEDI_ANJANI DEON ENERGY
Puissance4.418MW
Type de tracker1P HSAT
Mise en serviceMar 2025
ClientDeon Energy
LocalisationGadhada
4.418MW1P HSATSUNCHASER X
Aperçu du projet
4.418MW Gadhada Solar Project Powered by 1P HSAT
The 4.418MW solar project adds to Sunchaser Structures' installed base of solar mounting and tracking systems at Gadhada, Gujarat. It was executed for Deon Energy. The plant was commissioned in Mar 2025.
The 1P HSAT platform underpins the installation, chosen for its structural stability, low maintenance demand and dependable day-to-day performance.
The project reflects Sunchaser's focus on precision engineering, durable structures and disciplined site execution for utility-scale solar.
