4.517MW KHARVA SKY ENERGY
Puissance4.517MW
Type de tracker1P HSAT_Airavat(ALL DC)_60 Deg.
Mise en serviceOct 2025
ClientSky Energy
LocalisationSurendranagar
4.517MW1P HSAT_Airavat(ALL DC)_60 Deg.SUNCHASER X
Aperçu du projet
4.517MW Surendranagar Solar Project Powered by 1P HSAT_Airavat(ALL DC)_60 Deg.
Delivered by Sunchaser Structures, the 4.517MW solar project at Surendranagar, Gujarat forms part of a growing utility-scale portfolio. It was executed for Sky Energy. The plant was commissioned in Oct 2025.
Module support is provided by the 1P HSAT_Airavat(ALL DC)_60 Deg. system, built for accurate alignment, structural durability and reliable output across the plant's service life.
Robust structural design, corrosion-protected steel and controlled installation practice keep the plant performing reliably year after year.
