✔ Terminé

4.602MW GAGODAR,KUTCHH(MAHADEV) DEON ENERGY

Accueil / Projets / 4.602MW GAGODAR,KUTCHH(MAHADEV) DEON ENERGY

Puissance4.602MW
Type de tracker1P Seasonal Tilt(Hat)
Mise en serviceSep 2025
ClientDeon Energy
LocalisationRapar
4.602MW1P Seasonal Tilt(Hat)SUNCHASER X
Aperçu du projet

4.602MW Rapar Solar Project Powered by 1P Seasonal Tilt(Hat)

Sunchaser Structures supplied and commissioned the 4.602MW solar project at Rapar, Gujarat. It was executed for Deon Energy. The plant was commissioned in Sep 2025.

It uses the 1P Seasonal Tilt(Hat) structure, designed for precise module alignment, predictable long-term behaviour and straightforward installation on site.

Careful structural engineering and quality-controlled fabrication give the plant a long, low-maintenance service life while supporting steady energy delivery.

Localisation

Emplacement du site — Rapar

Voir sur la carte ↗

Prêt à lancer votre projet ?

Parlez-nous de votre site et nous concevrons une solution tracker ou MMS adaptée à votre terrain, climat et objectifs de rendement.

Démarrer un projet →