✔ Completato

4.709MW MOTA ANKADIYA DEON ENERGY

Home / Progetti / 4.709MW MOTA ANKADIYA DEON ENERGY

Potenza4.709MW
Tipo di inseguitore1P SEASONAL TILT (72X72)
Messa in servizioAug 2025
ClienteDeon Energy
LocalitàAmreli
4.709MW1P SEASONAL TILT (72X72)SUNCHASER X
Panoramica del progetto

4.709MW Amreli Solar Project Powered by 1P Seasonal Tilt(72x72)

Delivered by Sunchaser Structures, the 4.709MW solar project at Amreli, Gujarat forms part of a growing utility-scale portfolio. It was executed for Deon Energy. The plant was commissioned in Aug 2025.

Module support is provided by the 1P Seasonal Tilt(72x72) system, built for accurate alignment, structural durability and reliable output across the plant's service life.

Robust structural design, corrosion-protected steel and controlled installation practice keep the plant performing reliably year after year.

Dove si trova

Posizione del sito — Amreli

Vedi sulla mappa ↗

Pronto ad avviare il tuo progetto?

Raccontaci del tuo sito e progetteremo una soluzione tracker o MMS su misura per terreno, clima e obiettivi di rendimento.

Avvia un progetto →