4.883MW DEVLA(DHARI) AMBIT ENERGY
Puissance4.883MW
Type de trackerAIRAVAT - 1P HSAT MULTI DRIVE
Mise en serviceMay 2024
ClientAmbit Energy
LocalisationDhari
4.883MWAIRAVAT - 1P HSAT MULTI DRIVESUNCHASER X
Aperçu du projet
4.883MW Dhari Solar Project Powered by 1P HSAT
Sunchaser Structures supplied and commissioned the 4.883MW solar project at Dhari, Gujarat. It was executed for Ambit Energy. The plant was commissioned in May 2024.
It uses the 1P HSAT structure, designed for precise module alignment, predictable long-term behaviour and straightforward installation on site.
Careful structural engineering and quality-controlled fabrication give the plant a long, low-maintenance service life while supporting steady energy delivery.
