4MW KARIYANI DEON ENERGY
القدرة4MW
نوع المتتبّع1P HSAT
سنة التشغيلFeb 2024
العميلDeon Energy
الموقعBotad
4MW1P HSATSUNCHASER X
نظرة عامة على المشروع
4MW Botad Solar Project Powered by 1P HSAT
The 4MW solar project is part of Sunchaser Structures' utility-scale solar portfolio at Botad, Gujarat. It was executed for Deon Energy. The plant was commissioned in Feb 2024.
The plant is built on the 1P HSAT system, engineered to hold module alignment accurately over the full project life and to keep generation consistent season after season.
Sunchaser's engineering, galvanised structural design and site execution keep the plant dependable through its operating life and reduce long-term maintenance effort.
