5.203MW VALIYA (BEST PAPER) KP GROUP
Leistung5.203MW
Tracker-TypAIRAVAT - 1P HSAT MULTI DRIVE
InbetriebnahmeFeb 2026
KundeKp Group
StandortAnkleshwar
5.203MWAIRAVAT - 1P HSAT MULTI DRIVESUNCHASER X
Projektübersicht
5.203MW Ankleshwar Solar Project Powered by 1P HSAT Airavat (All DC)
Sunchaser Structures supplied and commissioned the 5.203MW solar project at Ankleshwar, Gujarat. It was executed for Kp Group. The plant was commissioned in Feb 2026.
It uses the 1P HSAT Airavat (All DC) structure, designed for precise module alignment, predictable long-term behaviour and straightforward installation on site.
Careful structural engineering and quality-controlled fabrication give the plant a long, low-maintenance service life while supporting steady energy delivery.
