✔ Terminé

5.206MW SARDARGADH - 2 DEON ENERGY

Accueil / Projets / 5.206MW SARDARGADH - 2 DEON ENERGY

Puissance5.206MW
Type de tracker1P Seasonal Tilt
Mise en serviceJun 2026
ClientDeon Energy
LocalisationManavadar
5.206MW1P Seasonal TiltSUNCHASER X
Aperçu du projet

5.206MW Manavadar Solar Project Powered by 1P Seasonal Tilt

The 5.206MW solar project is part of Sunchaser Structures' utility-scale solar portfolio at Manavadar, Gujarat. It was executed for Deon Energy. The plant was commissioned in Jun 2026.

The plant is built on the 1P Seasonal Tilt system, engineered to hold module alignment accurately over the full project life and to keep generation consistent season after season.

Sunchaser's engineering, galvanised structural design and site execution keep the plant dependable through its operating life and reduce long-term maintenance effort.

Prêt à lancer votre projet ?

Parlez-nous de votre site et nous concevrons une solution tracker ou MMS adaptée à votre terrain, climat et objectifs de rendement.

Démarrer un projet →