✔ Abgeschlossen

5.215MW SAMBHETI(BHARUCH) KP GROUP

Start / Projekte / 5.215MW SAMBHETI(BHARUCH) KP GROUP

Leistung5.215MW
Tracker-TypAIRAVAT - 1P HSAT MULTI DRIVE
InbetriebnahmeApr 2025
KundeKp Group
StandortHansot
5.215MWAIRAVAT - 1P HSAT MULTI DRIVESUNCHASER X
Projektübersicht

5.215MW Hansot Solar Project Powered by 1P HSAT(All DC)

The 5.215MW solar project is part of Sunchaser Structures' utility-scale solar portfolio at Hansot, Gujarat. It was executed for Kp Group. The plant was commissioned in Apr 2025.

The plant is built on the 1P HSAT(All DC) system, engineered to hold module alignment accurately over the full project life and to keep generation consistent season after season.

Sunchaser's engineering, galvanised structural design and site execution keep the plant dependable through its operating life and reduce long-term maintenance effort.

Standort

Projektstandort — Hansot

Auf Karte ansehen ↗

Bereit, Ihr Projekt zu starten?

Erzählen Sie uns von Ihrem Standort und wir entwickeln eine Tracker- oder MMS-Lösung, die auf Gelände, Klima und Ertragsziele zugeschnitten ist.

Projekt starten →