✔ Abgeschlossen

5.231MW JAKHAU-4_KUTCHH(AVICHAL) KP GROUP

Start / Projekte / 5.231MW JAKHAU-4_KUTCHH(AVICHAL) KP GROUP

Leistung5.231MW
Tracker-Typ1P HSAT(All DC)
InbetriebnahmeMay 2025
KundeKp Group
StandortNaliya
5.231MW1P HSAT(All DC)SUNCHASER X
Projektübersicht

5.231MW Naliya Solar Project Powered by 1P HSAT(All DC)

The 5.231MW solar project is part of Sunchaser Structures' utility-scale solar portfolio at Naliya, Gujarat. It was executed for Kp Group. The plant was commissioned in May 2025.

The plant is built on the 1P HSAT(All DC) system, engineered to hold module alignment accurately over the full project life and to keep generation consistent season after season.

Sunchaser's engineering, galvanised structural design and site execution keep the plant dependable through its operating life and reduce long-term maintenance effort.

Standort

Projektstandort — Naliya

Auf Karte ansehen ↗

Bereit, Ihr Projekt zu starten?

Erzählen Sie uns von Ihrem Standort und wir entwickeln eine Tracker- oder MMS-Lösung, die auf Gelände, Klima und Ertragsziele zugeschnitten ist.

Projekt starten →