✔ Abgeschlossen

5.239MW LINCH GRE RENEW

Start / Projekte / 5.239MW LINCH GRE RENEW

Leistung5.239MW
Tracker-Typ1P HSAT Airavat
InbetriebnahmeMar 2026
KundeGre Renew
StandortKadi
5.239MW1P HSAT AiravatSUNCHASER X
Projektübersicht

5.239MW Kadi Solar Project Powered by 1P HSAT Airavat

The 5.239MW solar project is part of Sunchaser Structures' utility-scale solar portfolio at Kadi, Gujarat. It was executed for Gre Renew. The plant was commissioned in Mar 2026.

The plant is built on the 1P HSAT Airavat system, engineered to hold module alignment accurately over the full project life and to keep generation consistent season after season.

Sunchaser's engineering, galvanised structural design and site execution keep the plant dependable through its operating life and reduce long-term maintenance effort.

Standort

Projektstandort — Kadi

Auf Karte ansehen ↗

Bereit, Ihr Projekt zu starten?

Erzählen Sie uns von Ihrem Standort und wir entwickeln eine Tracker- oder MMS-Lösung, die auf Gelände, Klima und Ertragsziele zugeschnitten ist.

Projekt starten →