✔ Terminé

5.298MW SANDHAN(SKA DAIRY-3) KP GROUP

Accueil / Projets / 5.298MW SANDHAN(SKA DAIRY-3) KP GROUP

Puissance5.298MW
Type de tracker1P HSAT(BLOCK_All DC)
Mise en serviceJun 2025
ClientKp Group
LocalisationNaliya
5.298MW1P HSAT(BLOCK_All DC)SUNCHASER X
Aperçu du projet

5.298MW Naliya Solar Project Powered by 1P HSAT(BLOCK_All DC)

Delivered by Sunchaser Structures, the 5.298MW solar project at Naliya, Gujarat forms part of a growing utility-scale portfolio. It was executed for Kp Group. The plant was commissioned in Jun 2025.

Module support is provided by the 1P HSAT(BLOCK_All DC) system, built for accurate alignment, structural durability and reliable output across the plant's service life.

Robust structural design, corrosion-protected steel and controlled installation practice keep the plant performing reliably year after year.

Localisation

Emplacement du site — Naliya

Voir sur la carte ↗

Prêt à lancer votre projet ?

Parlez-nous de votre site et nous concevrons une solution tracker ou MMS adaptée à votre terrain, climat et objectifs de rendement.

Démarrer un projet →