✔ Terminé

8.5MW GHADA, BANASKANTHA PROZEAL GREEN ENERGY LIMITED

Accueil / Projets / 8.5MW GHADA, BANASKANTHA PROZEAL GREEN ENERGY LIMITED

Puissance8.5MW
Type de tracker1P HSAT Airavat (All DC)
Mise en serviceFeb 2026
ClientProzeal Green Energy Limited
LocalisationDisa
8.5MW1P HSAT Airavat (All DC)SUNCHASER X
Aperçu du projet

8.5MW Disa Solar Project Powered by 1P HSAT Airavat (All DC)

Sunchaser Structures supplied and commissioned the 8.5MW solar project at Disa, Gujarat. It was executed for Prozeal Green Energy Limited. The plant was commissioned in Feb 2026.

It uses the 1P HSAT Airavat (All DC) structure, designed for precise module alignment, predictable long-term behaviour and straightforward installation on site.

Careful structural engineering and quality-controlled fabrication give the plant a long, low-maintenance service life while supporting steady energy delivery.

Localisation

Emplacement du site — Disa

Voir sur la carte ↗

Prêt à lancer votre projet ?

Parlez-nous de votre site et nous concevrons une solution tracker ou MMS adaptée à votre terrain, climat et objectifs de rendement.

Démarrer un projet →