✔ Terminé

0.12MW PADADHARI ADITYA SOLAR ENERGY

Accueil / Projets / 0.12MW PADADHARI ADITYA SOLAR ENERGY

Puissance0.12MW
Type de tracker1P SEASONAL CHASE
Mise en serviceDec 2023
ClientAditya Solar Energy
LocalisationSurendranagar
0.12MW1P SEASONAL CHASESUNCHASER X
Aperçu du projet

0.12MW Surendranagar Solar Project Powered by 1P Seasonal Chase

Sunchaser Structures supplied and commissioned the 0.12MW solar project at Surendranagar, Gujarat. It was executed for Aditya Solar Energy. The plant was commissioned in Dec 2023.

It uses the 1P Seasonal Chase structure, designed for precise module alignment, predictable long-term behaviour and straightforward installation on site.

Careful structural engineering and quality-controlled fabrication give the plant a long, low-maintenance service life while supporting steady energy delivery.

Localisation

Emplacement du site — Surendranagar

Voir sur la carte ↗

Prêt à lancer votre projet ?

Parlez-nous de votre site et nous concevrons une solution tracker ou MMS adaptée à votre terrain, climat et objectifs de rendement.

Démarrer un projet →