✔ Completato

0.12MW PADADHARI ADITYA SOLAR ENERGY

Home / Progetti / 0.12MW PADADHARI ADITYA SOLAR ENERGY

Potenza0.12MW
Tipo di inseguitore1P Seasonal Chase
Messa in servizioDec 2023
ClienteAditya Solar Energy
LocalitàSurendranagar
0.12MW1P Seasonal ChaseSUNCHASER X
Panoramica del progetto

0.12MW Surendranagar Solar Project Powered by 1P Seasonal Chase

Sunchaser Structures supplied and commissioned the 0.12MW solar project at Surendranagar, Gujarat. It was executed for Aditya Solar Energy. The plant was commissioned in Dec 2023.

It uses the 1P Seasonal Chase structure, designed for precise module alignment, predictable long-term behaviour and straightforward installation on site.

Careful structural engineering and quality-controlled fabrication give the plant a long, low-maintenance service life while supporting steady energy delivery.

Dove si trova

Posizione del sito — Surendranagar

Vedi sulla mappa ↗

Pronto ad avviare il tuo progetto?

Raccontaci del tuo sito e progetteremo una soluzione tracker o MMS su misura per terreno, clima e obiettivi di rendimento.

Avvia un progetto →