1.107MW KODDARAM AIRSUN SOLAR
القدرة1.107MW
نوع المتتبّع2P Fix Tilt(Hat)
سنة التشغيلJun 2025
العميلAirsun Solar
الموقعKheralu
1.107MW2P Fix Tilt(Hat)SUNCHASER X
نظرة عامة على المشروع
1.107MW Kheralu Solar Project Powered by 2P Fix Tilt(Hat)
Sunchaser Structures supplied and commissioned the 1.107MW solar project at Kheralu, Gujarat. It was executed for Airsun Solar. The plant was commissioned in Jun 2025.
It uses the 2P Fix Tilt(Hat) structure, designed for precise module alignment, predictable long-term behaviour and straightforward installation on site.
Careful structural engineering and quality-controlled fabrication give the plant a long, low-maintenance service life while supporting steady energy delivery.
