✔ Completato

1.107MW KODDARAM AIRSUN SOLAR

Home / Progetti / 1.107MW KODDARAM AIRSUN SOLAR

Potenza1.107MW
Tipo di inseguitore2P Fix Tilt(Hat)
Messa in servizioJun 2025
ClienteAirsun Solar
LocalitàKheralu
1.107MW2P Fix Tilt(Hat)SUNCHASER X
Panoramica del progetto

1.107MW Kheralu Solar Project Powered by 2P Fix Tilt(Hat)

Sunchaser Structures supplied and commissioned the 1.107MW solar project at Kheralu, Gujarat. It was executed for Airsun Solar. The plant was commissioned in Jun 2025.

It uses the 2P Fix Tilt(Hat) structure, designed for precise module alignment, predictable long-term behaviour and straightforward installation on site.

Careful structural engineering and quality-controlled fabrication give the plant a long, low-maintenance service life while supporting steady energy delivery.

Dove si trova

Posizione del sito — Kheralu

Vedi sulla mappa ↗

Pronto ad avviare il tuo progetto?

Raccontaci del tuo sito e progetteremo una soluzione tracker o MMS su misura per terreno, clima e obiettivi di rendimento.

Avvia un progetto →