✔ Abgeschlossen

1.815MW KODRAM-P1(MEHSANA) SUNDROP POWER

Start / Projekte / 1.815MW KODRAM-P1(MEHSANA) SUNDROP POWER

Leistung1.815MW
Tracker-Typ1P TSAT(All DC)
InbetriebnahmeJan 2025
KundeSundrop Power
StandortKheralu
1.815MW1P TSAT(All DC)SUNCHASER X
Projektübersicht

1.815MW Kheralu Solar Project Powered by 1P TSAT(All DC)

Delivered by Sunchaser Structures, the 1.815MW solar project at Kheralu, Gujarat forms part of a growing utility-scale portfolio. It was executed for Sundrop Power. The plant was commissioned in Jan 2025.

Module support is provided by the 1P TSAT(All DC) system, built for accurate alignment, structural durability and reliable output across the plant's service life.

Robust structural design, corrosion-protected steel and controlled installation practice keep the plant performing reliably year after year.

Standort

Projektstandort — Kheralu

Auf Karte ansehen ↗

Bereit, Ihr Projekt zu starten?

Erzählen Sie uns von Ihrem Standort und wir entwickeln eine Tracker- oder MMS-Lösung, die auf Gelände, Klima und Ertragsziele zugeschnitten ist.

Projekt starten →