✔ Terminé

1.815MW KODRAM-P1(MEHSANA) SUNDROP POWER

Accueil / Projets / 1.815MW KODRAM-P1(MEHSANA) SUNDROP POWER

Puissance1.815MW
Type de tracker1P TSAT(All DC)
Mise en serviceJan 2025
ClientSundrop Power
LocalisationKheralu
1.815MW1P TSAT(All DC)SUNCHASER X
Aperçu du projet

1.815MW Kheralu Solar Project Powered by 1P TSAT(All DC)

Delivered by Sunchaser Structures, the 1.815MW solar project at Kheralu, Gujarat forms part of a growing utility-scale portfolio. It was executed for Sundrop Power. The plant was commissioned in Jan 2025.

Module support is provided by the 1P TSAT(All DC) system, built for accurate alignment, structural durability and reliable output across the plant's service life.

Robust structural design, corrosion-protected steel and controlled installation practice keep the plant performing reliably year after year.

Localisation

Emplacement du site — Kheralu

Voir sur la carte ↗

Prêt à lancer votre projet ?

Parlez-nous de votre site et nous concevrons une solution tracker ou MMS adaptée à votre terrain, climat et objectifs de rendement.

Démarrer un projet →