✔ Completato

1MW RAYGADH(BRIGHT SOURCE) DEON ENERGY

Home / Progetti / 1MW RAYGADH(BRIGHT SOURCE) DEON ENERGY

Potenza1MW
Tipo di inseguitore1P Seasonal Tilt(72x72)
Messa in servizioMar 2025
ClienteDeon Energy
LocalitàDhrangadhra
1MW1P Seasonal Tilt(72x72)SUNCHASER X
Panoramica del progetto

1MW Dhrangadhra Solar Project Powered by 1P Seasonal Tilt(72x72)

Sunchaser Structures supplied and commissioned the 1MW solar project at Dhrangadhra, Gujarat. It was executed for Deon Energy. The plant was commissioned in Mar 2025.

It uses the 1P Seasonal Tilt(72x72) structure, designed for precise module alignment, predictable long-term behaviour and straightforward installation on site.

Careful structural engineering and quality-controlled fabrication give the plant a long, low-maintenance service life while supporting steady energy delivery.

Dove si trova

Posizione del sito — Dhrangadhra

Vedi sulla mappa ↗

Pronto ad avviare il tuo progetto?

Raccontaci del tuo sito e progetteremo una soluzione tracker o MMS su misura per terreno, clima e obiettivi di rendimento.

Avvia un progetto →