✔ Terminé

1MW RAYGADH(BRIGHT SOURCE) DEON ENERGY

Accueil / Projets / 1MW RAYGADH(BRIGHT SOURCE) DEON ENERGY

Puissance1MW
Type de tracker1P Seasonal Tilt(72x72)
Mise en serviceMar 2025
ClientDeon Energy
LocalisationDhrangadhra
1MW1P Seasonal Tilt(72x72)SUNCHASER X
Aperçu du projet

1MW Dhrangadhra Solar Project Powered by 1P Seasonal Tilt(72x72)

Sunchaser Structures supplied and commissioned the 1MW solar project at Dhrangadhra, Gujarat. It was executed for Deon Energy. The plant was commissioned in Mar 2025.

It uses the 1P Seasonal Tilt(72x72) structure, designed for precise module alignment, predictable long-term behaviour and straightforward installation on site.

Careful structural engineering and quality-controlled fabrication give the plant a long, low-maintenance service life while supporting steady energy delivery.

Localisation

Emplacement du site — Dhrangadhra

Voir sur la carte ↗

Prêt à lancer votre projet ?

Parlez-nous de votre site et nous concevrons une solution tracker ou MMS adaptée à votre terrain, climat et objectifs de rendement.

Démarrer un projet →