3.142MW BHOJABEDI PHASE 2(JAMJODHPUR) SOHAM ENTERPRICE
Home / Our Projects / 3.142MW BHOJABEDI PHASE 2(JAMJODHPUR) SOHAM ENTERPRICE
3.142MW Lalpur Solar Project Powered by 1P HSAT Airavat(Block) (All DC)_45 Deg.
The 3.142MW solar project is part of Sunchaser Structures' utility-scale solar portfolio at Lalpur, Gujarat. It was executed for Soham Enterprice. The plant was commissioned in Jan 2026.
The plant is built on the 1P HSAT Airavat(Block) (All DC)_45 Deg. system, engineered to hold module alignment accurately over the full project life and to keep generation consistent season after season.
Sunchaser's engineering, galvanised structural design and site execution keep the plant dependable through its operating life and reduce long-term maintenance effort.
