✔ Terminé

3.142MW BHOJABEDI PHASE 2(JAMJODHPUR) SOHAM ENTERPRICE

Accueil / Projets / 3.142MW BHOJABEDI PHASE 2(JAMJODHPUR) SOHAM ENTERPRICE

Puissance3.142MW
Type de tracker1P HSAT Airavat(Block) (All DC)_45 Deg.
Mise en serviceJan 2026
ClientSoham Enterprice
LocalisationLalpur
3.142MW1P HSAT Airavat(Block) (All DC)_45 Deg.SUNCHASER X
Aperçu du projet

3.142MW Lalpur Solar Project Powered by 1P HSAT Airavat(Block) (All DC)_45 Deg.

The 3.142MW solar project is part of Sunchaser Structures' utility-scale solar portfolio at Lalpur, Gujarat. It was executed for Soham Enterprice. The plant was commissioned in Jan 2026.

The plant is built on the 1P HSAT Airavat(Block) (All DC)_45 Deg. system, engineered to hold module alignment accurately over the full project life and to keep generation consistent season after season.

Sunchaser's engineering, galvanised structural design and site execution keep the plant dependable through its operating life and reduce long-term maintenance effort.

Localisation

Emplacement du site — Lalpur

Voir sur la carte ↗

Prêt à lancer votre projet ?

Parlez-nous de votre site et nous concevrons une solution tracker ou MMS adaptée à votre terrain, climat et objectifs de rendement.

Démarrer un projet →